Oslo, 5 July 2019: Scatec Solar ASA will release its second quarter results on Friday, 19 July 2019 at 07:00 am (CET).
A presentation of the results will be held on the same day at 08:00 am (CET). The location of the presentation is Høyres Hus (6th floor), Stortingsgata 20, Oslo. The presentation and Q&A session can be followed through a live webcast from: https://webtv.hegnar.no/presentation.php?webcastId=98041388
For further information, please contact:
Ingrid Aarsnes, VP Communication & IR
Tel: +47 950 38 364, Ingrid.aarsnes@scatec.com
About Scatec Solar
Scatec Solar is an integrated independent solar power producer, delivering affordable, rapidly deployable and sustainable clean energy worldwide. A long- term player, Scatec Solar develops, builds, owns, operates and maintains solar power plants and has an installation track record of more than 1 GW. The company has a total of 1.9 GW in operation and under construction in Argentina, Brazil, the Czech Republic, Egypt, Honduras, Jordan, Malaysia, Mozambique, Rwanda, South Africa and Ukraine.
With an established global presence and a significant project pipeline, the company is targeting a capacity of 3.5 GW in operation and under construction by end of 2021. Scatec Solar is headquartered in Oslo, Norway and listed on the Oslo Stock Exchange under the ticker symbol ‘SSO’. To learn more, visit www.scatec.com.
This information is subject to the disclosure requirements pursuant to Section 5-12 the Norwegian Securities Trading Act